Powered by eProject Guide RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA: A CASE STUDY OF AYETORO 1 SUBSTATION, AGUDA, LAGOS STATE | eProject Guide

RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA: A CASE STUDY OF AYETORO 1 SUBSTATION, AGUDA, LAGOS STATE

Code: AC025881360421  Price: 4,000   61 Pages     Chapter 1-5    6339 Views

RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA: A CASE STUDY OF AYETORO 1 SUBSTATION, AGUDA, LAGOS STATE ( ELECTRICAL AND ELECTRONIC PROJECT TOPIC)

 

ABSTRACT

 

A power system is set up basically to meet the demands of the customers. However, interruptions which are largely unavoidable contribute to the unavailability of power and thus prevent power system from achieving this. In most cases, it is the sustained interruptions that greatly affect both the utility company and its customers. Hence, it is necessary to find means of determining which component failure contributes most to the unavailability of the distribution system, and how this unavailability actually affects the customers. This is to enable system planners and designers to seek better ways of improving the reliability of a typical secondary distribution substation system having a single-end fed radial configuration. By using analytical method and network reduction technique, the substation reliability was analyzed based on the outage data gotten from the utility company. The conclusion from this work shows that transformer failure followed by the fuse failure contributes most to the substation’s unavailability. The overall system availability shows that the system’s performance is poor.


CHAPTER 1

INTRODUCTION

1.1        BACKGROUND

Electric power system is basically set up to supply electricity with little or no interruptions to its customers. The number of interruptions that occur while the system performs its intended function is part of what determines the overall reliability of the system. The other factor that determines its reliability is the quality of electricity delivered. Furthermore, the capability of a power system to continuously deliver quality electricity means that the customers are satisfied and the electricity providers are having favorable returns on their investment as they continue their business of supplying electricity. As electricity consumption has become an important factor that affects the drive needed for technology to grow and to facilitate the development of modern society, it is very important therefore to take seriously the issue of reliability of an electric power system.

Generation, transmission and distribution are the three subsystems of an electric power system. At the generating station, electricity is generated and transmitted through the high voltage transmission lines to the distribution substations. The distribution substation system considered covers the electrical system between the substation fed by the subtransmission system and the supply line to the consumers’ meters i.e. 11kV to 0.415kV transformation (Theraja and Theraja, 2005). The distribution substations are usually sited relatively near the customers for effective delivery, monitoring and maintenance of the substation and the customer end and are usually referred to as secondary distribution substation system. Distribution systems basically serve as the link from the distribution substation to the customer. Reliable and safe transfer of electricity to the customers covered by the distribution area is ensured by this system and is the main subject studied in this dissertation.

RELIABILITY EVALUATION OF SECONDARY DISTRIBUTION SYSTEM IN NIGERIA: A CASE STUDY OF AYETORO 1 SUBSTATION, AGUDA, LAGOS STATE ( ELECTRICAL AND ELECTRONIC PROJECT TOPIC)

 


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW