Powered by eProject Guide DESIGN AND CONSTRUCTION OF AUTOMATIC PHASE SELECTOR | eProject Guide

DESIGN AND CONSTRUCTION OF AUTOMATIC PHASE SELECTOR

Code: 20E9466E5C0421  Price: 4,000   61 Pages     Chapter 1-5    6333 Views

DESIGN AND CONSTRUCTION OF AUTOMATIC PHASE SELECTOR

CHAPTER ONE
INTRODUCTION
As the growing population of human race widens the gulf between energy supply
and energy demand, the imbalance in energy availability sent researchers into
excavating for a way of settling this age long squabble. A lasting solution is vested
on alternative use of the renewable energy source, a project that is yet to be
widely applied. Hence, the continuation of the unsettled yearns for sufficient
power. Consequently, the power lines are frequently over loaded resulting to a
trip of power by the action of switch gears or by the load shading process
undertaken by the distribution authorities.
Since it is crystal clear that some institutions such as health related institutions
and some other delicate systems should not be allowed to suffer equally with
their counterparts, Automatic Phase Selector is used to sustain energy
consumption in the time of phase trip. The design of this circuit involves the use
of automatic switches but the details of design varies from place to place, time to
time and also depends on the type of load involved.
This project involves the use of transistor driven relays to affect the change of
phase whenever the voltage condition becomes intolerable in the previous phase
connected.

DESIGN AND CONTRUCTION OF AUTOMATIC PHASE SELECTOR

CHAPTER ONE
INTRODUCTION
As the growing population of human race widens the gulf between energy supply
and energy demand, the imbalance in energy availability sent researchers into
excavating for a way of settling this age long squabble. A lasting solution is vested
on alternative use of the renewable energy source, a project that is yet to be
widely applied. Hence, the continuation of the unsettled yearns for sufficient
power. Consequently, the power lines are frequently over loaded resulting to a
trip of power by the action of switch gears or by the load shading process
undertaken by the distribution authorities.
Since it is crystal clear that some institutions such as health related institutions
and some other delicate systems should not be allowed to suffer equally with
their counterparts, Automatic Phase Selector is used to sustain energy
consumption in the time of phase trip. The design of this circuit involves the use
of automatic switches but the details of design varies from place to place, time to
time and also depends on the type of load involved.
This project involves the use of transistor driven relays to affect the change of
phase whenever the voltage condition becomes intolerable in the previous phase
connected.


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW