Powered by eProject Guide RESERVOIR SIMULATION USING MBAL | eProject Guide

RESERVOIR SIMULATION USING MBAL

Code: 73A839FE0A0521  Price: 4,000   61 Pages     Chapter 1-5    6407 Views

RESERVOIR SIMULATION USING MBAL

ABSTRACT
Fluid flow in a petroleum reservoir is a very complex phenomena and it is impossible to develop analytical solutions for practical issues due to the complex behaviour of multiphase flow. Reservoir simulation study the behaviour of fluid flow and provides numerical solutions to hydrodynamic problems of fluids in the petroleum reservoir-well systems with the help of a simulator. Reservoir simulation is used to predict the future performance of the reservoir so that intelligent decision can be made to optimize the economic recovery of hydrocarbons from the reservoir.

In this study MBal software was the simulator tool used. The study shows the application of MBal in predicting the future performance of the well. A work flow was applied for this study and Data was gotten from RZD field and inputted to MBal, where result was gotten. MBal software calculation estimated STOIP as 149.184MMSTB, predict volume of the water influx as 47268.8MMft3, also show the effect of aquifer on the pressure of the reservoir and show that water drive is the predominant drive mechanism responsible for production. Also history matching
and prediction run was done and it was predicted that the reservoir was to have a life span of 33 years with a recovery factor of 81.7%. This project show the importance of MBal in prediction of future performance.

RESERVOIR SIMULATION USING MBAL


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW