Powered by eProject Guide COMPARATIVE STUDY BETWEEN OVERBALANCED AND UNDERBALANCED OIL DRILLING METHODS | eProject Guide

COMPARATIVE STUDY BETWEEN OVERBALANCED AND UNDERBALANCED OIL DRILLING METHODS

Code: D91A6F2AAC0521  Price: 4,000   61 Pages     Chapter 1-5    6377 Views

COMPARATIVE STUDY BETWEEN OVERBALANCED AND UNDER BALANCED OIL DRILLING METHODS

ABSTRACT

The technique used worldwide while drilling is known as overbalanced drilling. Which is defined as the drilling process where the hydrostatic pressure used exceeds the formation pressure. This is done with the main purpose of “killing” the well. However, there are numerous problems that accompany overbalanced drilling. Such problems are differential pipe sticking, loss of circulation, formation damage and other problems. A relatively new technique was introduced, known as underbalanced drilling, where the well is being drilled with a hydrostatic pressure less than that of the formation. Correct and proper execution of such technique eliminates problems associated with overbalanced drilling. More precisely, underbalanced drilling solves the issues of formation damage, differential pressure sticking and loss of circulation. On the other hand, underbalanced drilling has its own problems as well. Additionally, underbalanced drilling increases the rate of penetration and provides other uses discussed in this project. Oil Drilling Methods

The objective of this paper was to compare between overbalanced and underbalanced drilling and ascertain which method is most suitable in all aspects. Finally, it can be concluded that UBD provides lower drilling costs, increased rate of penetration (ROP) and less hole problems when it was compared to overbalanced drilling of the same formations. Oil Drilling Methods

COMPARATIVE STUDY BETWEEN OVERBALANCED AND UNDER BALANCED OIL DRILLING METHODS


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW