PRESSURE TRANSIENT ANALYSIS USING SAPHIR

Code: 259D5FB5F00521  Price: 4,000   61 Pages     Chapter 1-5    6380 Views

PRESSURE TRANSIENT ANALYSIS USING SAPHIR

 

ABSTRACT

Monitoring and maintenance is a continuous process in the various phases of a well’s life. One of the essential part of monitoring is well testing. Just as a regular medical checkup is advised for humans so is well testing advised for a target formation. Well testing provides a means of obtaining information about the well and the reservoir as well as diagnosing a problem if any is present. The objective for a well test determines the type and design to be carried out. In this study, build-up test was the main focus. Obtaining relevant data in order to characterize a reservoir and determine initial pressure is a major objective of a build-up test. The results required from the tests cannot be directly obtained from the well test data. Hence, the importance of analysis. There are various methods used to analyze well test data such as manual plotting, excel analysis and software analysis. In this study, a build-up test data was obtain from an XYZ field for two dual string  oil producing wells (4 wells) and was analyzed using a tool called Saphir.  The result from tool showed the properties of the reservoir required for characterization i.e. pressure, permeability and boundary conditions. It was seen that one well has undergone a successful stimulation and the other three damaged with one of them severely damaged. The highly damaged well was recommended for stimulation and the rest was recommended to have future plans for stimulation. Further studies were made to ascertain the effect of stimulation on the damaged wells and significant gain in barrels produced were observed. Well property such as bottom-hole flowing pressure was calculated using the results obtained from the analysis.

 

PRESSURE TRANSIENT ANALYSIS USING SAPHIR


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW