Powered by eProject Guide A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES | eProject Guide

A REVIEW OF THE RHEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES

Code: 08D72DED670521  Price: 4,000   61 Pages     Chapter 1-5    6405 Views

A REVIEW OF THE THEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES

ABSTRACT

Cuttings transportation during in non-vertical boreholes is necessary for oil and gas wells. Adequate cuttings removal from a well in drilling is critical for cost-effective drilling as high annular cuttings buildup often leads to high risk of stuck pipe, reduced rate of penetration and other impediments to standard drilling and completion procedures.

This study investigates how theological parameters influence the removal of cuttings in non-vertical boreholes. It contributes to work already done to ensure efficient hole cleaning process. In this study, the rheological parameters examined were the flow index (n), consistency index (K), plastic viscosity (PV), mud yield point (YP), YP/PV ratio, apparent viscosity and effective viscosity. Fifteen mud samples, three annular velocities (3.82, 2.86 and 1.91 ft/sec) and three hole angles (30o, 45o and 70o) were considered. An Excel Spreadsheets program was used to determine the parameters. The results of this study show that, higher annular mud velocities are required for efficient hole cleaning in directional wells than in vertical wells. Increasing values of YP, YP/PV ratio and K promote effective cuttings transport while the value of n should be low. Effective and apparent viscosities also should be high.

 

CHAPTER ONE

INTRODUCTION

1.1 Problem Definition

Many materials of engineering interest must be handled and transported as slurries or suspensions of insoluble particulate matter. Transportation of cuttings in non-vertical boreholes is of no exception. Almost the same thing occurs whereby the cuttings act as the solids in the drilling fluid. In spite of the many technological advances that have accompanied the drilling of non-vertical boreholes, one significant remaining challenge is effective cuttings transport, particularly in deviated wells.

The transportation of cuttings during drilling has a major influence on the economics of the drilling process. Problems that can occur as a result of inefficient hole cleaning from cuttings include reduced weight on bit, increase risk of pipe stuck and inability to attain the desired reach, reduced rate of penetration (ROP), extra cost because of the need of special additives in the drilling fluid, extra pipe wear, transient hole blockage which can lead to lost circulation and wasted time for wiper tripping. These problems have prompted significant research into cuttings transport during the past 50 years. (Kelessidis, 2004).

 

 

A REVIEW OF THE THEOLOGICAL EFFECTS OF POWER LAW DRILLING FLUIDS ON CUTTINGS TRANSPORTATION IN NON-VERTICAL BOREHOLES

 


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW