Powered by eProject Guide APPLICATION OF MINIMUM CURVATURE METHOD TO WELLPATH CALCULATIONS | eProject Guide

APPLICATION OF MINIMUM CURVATURE METHOD TO WELLPATH CALCULATIONS

Code: 8E0252F3B50521  Price: 4,000   61 Pages     Chapter 1-5    6467 Views

APPLICATION OF MINIMUM CURVATURE METHOD TO WELLPATH CALCULATIONS

ABSTRACT

A major drawback of directional and horizontal well drilling is the numerous complex computations required to be done while planning a well. These computations are very stressful and time consuming especially when done manually. One of the objectives of this study was to develop a user friendly Excel Spreadsheet program that would make the computations of these well trajectory parameters easier, faster and accurate.

An Excel Spreadsheet program was developed employing the Minimum Curvature method (and for other five methods) for well path design and planning. This would help increase the usage of these trajectory methods especially the Minimum Curvature method. The program is able to provide pictorial views both in the vertical and horizontal plane of the trajectory of the drilling bit’s position in the well bore. This would therefore help to minimize risk and uncertainty surrounding hitting predetermined target. This is possible because deviations can easily be detected and the necessary directional corrections or adjustment be initiated to re-orient the drilling bit to the right course before (planning process) and during the drilling operations.

 

CHAPTER 1

FORMULATION OF THE PROBLEM

1.1 Introduction

Directional drilling is the science and art of deviating a wellbore along a planned course to a subsurface target whose location is a given lateral distance and direction from the vertical (Bourgoyne et al, 1991). Directional drilling and horizontal wells represent an efficient way to achieve or hitting special targets that may or are very difficult to reach using vertical wells (Tarek, 2000). Directional drilling is relatively done to increase production rates, control water and gas conning, control sand production and increase recovery rate (Bourgoyne et al, 1991). There are many reservoirs which can not be tapped by vertical wells or would be uneconomical to exploit with vertical wells (Bourgoyne et al, 1991). Other reservoirs are also characterized by vertical permeability or the pay zones may be very thin and producing with vertical wells would require quiet a number of them which would make vertical wells to be very uneconomical in such situations. The application of vertical wells in such formations could also result in lower ultimate recovery (Tarek, 2000). In such low permeability formations, the only way out is to use directional and horizontal well technology which has over the years proved to enhance ultimate recovery (Bourgoyne et al, 1991). Due to the more economical nature of directional and horizontal wells over vertical wells in most cases, they are mostly the preferred technology in offshore drilling technology (Bourgoyne et al, 1991).

 

 

APPLICATION OF MINIMUM CURVATURE METHOD TO WELLPATH CALCULATIONS


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW