Powered by eProject Guide DETAILED ANALYSIS OF PRESSURE DROP IN A LARGE DIAMETER VERTICAL PIPE | eProject Guide

DETAILED ANALYSIS OF PRESSURE DROP IN A LARGE DIAMETER VERTICAL PIPE

Code: 7E811477370521  Price: 4,000   61 Pages     Chapter 1-5    6388 Views

DETAILED ANALYSIS OF PRESSURE DROP IN A LARGE DIAMETER VERTICAL PIPE

ABSTRACT

With the ever increasing need to optimize production, the accurate understanding of the mechanics of multi-phase flow and its effect on the pressure drop along the oil-well flow string is becoming more pertinent. The efficient design of gas-lift pump, electric submersible pumps, separators, flow strings and other production equipment depends on the accurate prediction of the pressure drop along the flow pipe. Pressure is the energy of the reservoir/well and it is crucial to understand how a change in fluid properties, flow conditions and pipe geometric properties affect this important parameter in the oil and gas industry. Extensive work on this subject has been done by numerous investigators albeit in small diameter pipes. Reliance on the empirical correlations from this investigators has been somewhat misleading in modelling pressure drop in large diameter pipes (usually >100 mm) because of the limitations imposed by the diameter at which they were developed and the range of data and conditions used in deriving them.

In this work, experimental data from the experimental study by Dr. Mukhtar Abdulkadir was used as the data source. The gas velocities, liquid velocities, film fraction, gas and liquid properties and the pipe geometric properties from the above mentioned experiment were used to model the frictional and total pressure drop from six correlations. Results were analyzed and compared with the experimental results.

 

CHAPTER ONE

INTRODUCTION

1.1 General introduction

Profitable production of oil and gas fields relies on accurate prediction of the multi-phase well flow. The determination of flowing bottom-hole pressure (BHP) in oil wells is very important to petroleum engineers. It helps in designing production tubing, determination of artificial lift requirements and in many other production engineering aspects such as avoiding producing a well below its bubble point in the sand-face to maintain completion stability around the wellbore (Ahmed, 2011). Well fluids above bubble point pressure exist as a single phase as it is being produced from the reservoir. However, as they navigate their way through the network of interconnected pores in the reservoir to the wellbore, there is a continuous reduction in pressure as overburden stress is gradually reduced. This phenomenon leads to the liberation of the entrained gas. As the single-phase fluid rises in the tubing, a critical point is reached where some of the gases begin to come out of solution along the length of the pipe. In other words, it changes from single-phase flow to multi-phase flow.

 

 

DETAILED ANALYSIS OF PRESSURE DROP IN A LARGE DIAMETER VERTICAL PIPE


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW