Powered by eProject Guide DIAGNOSTIC PLOTS FOR ANALYSIS OF WATER PRODUCTION AND RESERVOIR PERFORMANCE | eProject Guide

DIAGNOSTIC PLOTS FOR ANALYSIS OF WATER PRODUCTION AND RESERVOIR PERFORMANCE

Code: AC5ADE01A00521  Price: 4,000   61 Pages     Chapter 1-5    6385 Views

DIAGNOSTIC PLOTS FOR ANALYSIS OF WATER PRODUCTION AND RESERVOIR PERFORMANCE

ABSTRACT

The research is aimed at the understanding of the various diagnostic plots for the analysis of water production that are available as well as the application of these methods in a case study. It also aimed at the establishment of a work flow for the evaluation of water production mechanisms. A workflow was developed that combines numerical simulation and diagnostic plots to analyze the water production performance in a reservoir. This workflow was validated using a case study. The multi-layer reservoir model with varying vertical permeability was constructed using a numerical simulator with the reservoir properties of the case study. Trends from the field data were analyzed using the trends observed from the simulated data as templates.

For the production wells, oil rate and water rate versus time plots as well as the X-plot were used to evaluate water production characteristics of the case study. The water-oil ratio (WOR), WOR derivative and X-Plot were used for the field production diagnosis while the Hall and the Hearn Plots were used for the water injection well diagnosis. The results of the diagnostic plots showed that multi-layered channelling was the controlling mechanism and the cause of the water production in the case study. For the injection wells, the plots indicated that some wells in the case study had the problem of extensive near wellbore fracturing while other wells had the problem of wellbore plugging.

The workflow and results of this study can be applied by reservoir and production engineering teams to other reservoirs to diagnose water production mechanisms; identify sources of water production, and provide information for planning water management programmes to mitigate excessive water production problems.

 

CHAPTER 1

1.0 INTRODUCTION

1.1 DESCRIPTION OF PROBLEM

Produced water is any water that is present in a reservoir with the hydrocarbon resource and is produced to the surface with the crude oil or natural gas. This water could either come from an aquifer or from injection wells in water flooding process. The production of this water alongside the oil from any reservoir is a condition that is natural in all reservoirs. It is expected that water production would increase with the life of the reservoir. However, a premature increase in the production of water in any reservoir is an undesirable condition. Excess or premature water production, exists with associated cost implication on the surface facilities, artificial lift systems, corrosion and scale problems. Another effect that ensues is a decrease in the recovery factors as oil is left behind the displacement front, thereby reducing the performance of the reservoir. All these along with the decrease in the quantity and quality of the oil imply a reduced profitability.

Globally, as at 2002, analysis showed that three barrels of water is produced to one barrel of oil and the cost of water handling ranges from 5 to 50 cents, where this cost is a function of the water cut (Bailey et al, 2000). It is therefore imperative that actions be taken to reduce this adverse effect, as this will not just lead to potential savings but its greatest values comes from potential increase in oil production and recovery. To control the produced water effectively, the source or the mechanism of the water problem must be identified. Diagnostic plots have been used successfully to identify the mechanism of water production and that is the focus of this work.

 

 

DIAGNOSTIC PLOTS FOR ANALYSIS OF WATER PRODUCTION AND RESERVOIR PERFORMANCE


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW