MATERIAL BALANCE APPLICATION FOR BROWNFIELD DEVELOPMENT

Code: DDC3D76CC50521  Price: 4,000   61 Pages     Chapter 1-5    6443 Views

MATERIAL BALANCE APPLICATION FOR BROWNFIELD DEVELOPMENT

 

ABSTRACT

The need to re-develop one of the Brown fields located in the Niger Delta area of Nigeria was necessitated by the fact that there are still three undeveloped reservoirs in the field. A total of six stacked reservoirs, A100 to A600 (all oil bearing with associated gas) were penetrated between 8552 ftss and 10652 ftss by APV-1 well. Reservoir blocks A200 and A600 are the largest in the field accounting for 77% of the total field STOIIP. The well was completed with a Two String Multiple (TSM) on the two levels, with the short string producing from the A200 reservoir and the long string producing from the deeper A600 reservoir, A300 behind the sleeve.

The purpose of this research is to identify the best developmental plan to produce the reservoirs, either with a TSM completion or with a Smart well completion based on the economics. There are many single well fields in the Niger Delta area of Nigeria that have not been optimally produced, hence this study seeks to maximize the life of this field.

The reservoirs were simulated and production forecast carried out amounted to 14.55 MMstb for a period of 16 years. After economic analysis was performed, the Net Present Value for the TSM and the Smart well completion were US $MM 241.9 and 248.88 respectively and an Internal Rate of Return of 155% and 202% respectively, hence the Smart well development plan is recommended.

 

CHAPTER ONE

1.0 BACKGROUND

Petroleum reserves are declining, and fewer noteworthy discoveries have been made in recent years (Abdus, 1990). The need to increase recovery from the vast amount of remaining oil and to compete globally require healthier reservoir management practices (Abdus et al, 1994). However, technological developments in all areas of petroleum exploration and exploitation, along with fast increasing computing power, are providing the tools to better develop and manage reservoirs to maximize economic recovery of hydrocarbons (Abdus, 1990).

 

 

MATERIAL BALANCE APPLICATION FOR BROWNFIELD DEVELOPMENT


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW