ABSTRACT
It was observed that there were areas to theoretical cost, control techniques and those of production with regard to overhead cost control, the company uses flexible budget and standard costing which was reviewed is that in proactive, various analysis is not done in depth and not all items are analysed.
As regards material control, it spares no effort in ensuring that it is effectively controlled with the exception of few methods of control reviewed in the literature, it implements all other techniques to the later. In the province of labour cost control the company applied very far techniques already discussed.
In short, there is a wide difference between the concepts and actual practice.
Title page
Certification
Dedication
Acknowledgement
Abstract
Table of contents
CHAPTER ONE
Introduction
Background of the study
Statement of the problem
Objectives of the study
Significance of the study
Scope of the study
Research hypothesis
Scope and limitation of study
Definition of terms
CHAPTER TWO
LITERATURE REVIEW
CHAPTER THREE
Research methodology and design
Population
Determination of sample size
Data collection
Chi-square
Decision rule
CHAPTER FOUR
PRESENTATION, ANALYSIS AND INTERPRETATION OF DATA
CHAPTER FIVE
Summary of finding, recommendation and conclusion
Summary of findings
Recommendation
Conclusion
Bibliography
Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.
Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.