Powered by eProject Guide PRODUCTION PLANNING AND CONTROL IN A MANUFACTURING CONCERN (A CASE STUDY OF DEM-MAG NIGERIA LIMITED OWERRI) | eProject Guide

PRODUCTION PLANNING AND CONTROL IN A MANUFACTURING CONCERN (A CASE STUDY OF DEM-MAG NIGERIA LIMITED OWERRI)

Code: 42D224E50F0521  Price: 4,000   61 Pages     Chapter 1-5    6313 Views

ABSTRACT

This research was designed to find out how production planning and control in a manufacturing concern can be improved to achieve the organizational aims and objectives.

This therefore draws the attention of establishment/ organization that practice it to realize the beat way for effective proper production planning and control needed for the operations.

This led to the purpose of the study, which include the production function which deals with determination what product or service to produce. How the new material and equipment are to be obtained and maintained.

To draw the attention of the organizations on what proportion production actually starts.

Questionnaires and interviews were the main research instrument contained (13) questions, which were analyzed. Random samplings were the sampling techniques used in drawing the sample from the population.

CHAPTER ONE

 1.1      BACKGROUND OF STUDY

The production function deals with determining what product or service to produce, how the raw material and equipment are to be obtained, acquiring layout and maintaining the physical facilities needed for the operation. It involves changing input getting output at a very reasonable cost at the right quality price and time 

Before an entrepreneur get into business one of the things he must consider before getting into business is to develop a production plan. The entrepreneur has to think of the products colors, shape, models, and kind of raw materials to be used and in what proportion. What is the most appropriate technology required, machines to be purchased leased or borrowed and what infrastructure facilities must be available before production actually starts. Any mistake that the entrepreneur makes at this point of planning stage count to be too costly.

  1. STATEMENT OF STUDY 

With the increasing growth and expansion of many manufacturing concerns in the economy. It is clear that adverse effect will be much if good attempt is not made to adequately and effectively specify what plan of production process is to be taken and the necessary measures to put in place so a s to ensure the highest level of productivity in the organization which is faced with economic depression.

If production is not adequately planned and controlled. They obviously will affect the  output level on the work place and as such most of or majority of the orders made by customer. Will not be met and the company will lose its goodwill and customers and all these represent various form of cost to the form.

  1. OBJECTIVES OF STUDY

 The study intends to examine the production planning and control function and how they are carried out in the present day Nigeria.

It is also essential to know to know the processes involved and when the problems are incurred.

PRODUCTION PLANNING AND CONTROL IN A MANUFACTURING CONCERN (A CASE STUDY OF DEM-MAG NIGERIA LIMITED OWERRI)

Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW