Powered by eProject Guide MATERIAL UTILIZATION SYSTEM IN MANUFACTURING ENTERPRISES | eProject Guide

MATERIAL UTILIZATION SYSTEM IN MANUFACTURING ENTERPRISES

Code: 8F84DDCFF1852022  Price: 4,000   71 Pages     Chapter 1-5    37 Views

MATERIAL UTILIZATION SYSTEM IN MANUFACTURING ENTERPRISE (A CASE STUDY OF ASABA TEXTILE MILL LIMITED ASABA)

 

CHAPTER ONE

1.0     INTRODUCTION

A history of Bendel Textile mill Ltd as it was called in the then defunct Bendel state but now renamed Asaba Textile mill Ltd immediately after the splitting of the state into Edo and Delta states in 1991, was incorporation in 1965.It was located on the eastern side of the town, Asaba, the headquarters of Delta state. It is cited close to the Lagos-Onitsha Express way for easy accessibility. The mill was created to assist in the relief of unemployment and to reduce rural migration of people to urban areas. Amongst other objectives of the firm are the manufacturing of textile fabric (100% cotton), modernization and expansion. However, the product line of the company is Africa print with a planned production capacity of 4000 metres per day. Crey cloth which is 10,560, 000 metres per annum taking twenty –two working days in a month. Both the production capacities so far achieved are 30,000 metres per day Grey baft that is 7920,000-metre p.a.

The slack in the full capacity achievement is due to insufficient supply of raw material (R/M), high labour cost, high labour turnover mostly in the spinning and weaving departments at the beginning of every year and also the demechanization of machines. The company has to cannibalize to put some machines into operation and a colossal amount is spent on the importation of German expatriates to carry out the job of machine cannibalism.

More so, the mill has staff strength of 840 comprising Administration, factory workers, security unit and labourers. It has a total sale of over eighty million Naira (N80m) p.a.The raw materials used by the mill are; cotton hint, chemical and dyestuff. Some are sourced locally while some are imported. Indian expatriates own the mill.

1.2     STATEMENT OF PROBLEM

The mill has chains of problems as regards the utilization of materials. A lot of problems of wastage are being suffered in the mill conspicuous amongst which are:
i.    Drops of cotton on the factory floor in the spinning department. This is of a common sight. As the bales of cotton are being put into the bale opener (machine) and to the scotcher where it forms laps which is taken to the cording machine to form sliver, raw cotton are seen everywhere littering on the floor. The propping cottons should be swept up or hand picked by the workers. Also workers should be provided by the with apron for keeping the dropped picked up good cottons and should be sent back to the scotecher to form a new lap.
ii.   Roving waste: In the speed frame section the shiver is turned in roving. Lots of waste occurs have as a result of machine rejects.Solution: The roving waste should be sent back to the roving machine which turns the roving into raw cotton which should then be sent back to the below room for lapping.
iii.   Half Weft: Wefts (wound prins) are normally in full. But in the pirn winding section, it is not uncommon to see half weft, which is automatically a waste, as machine will reject them.Solution: To avoid pirn wastage, pirns should not have a double end as this amount to waste. Also the supervisors should constantly monitor the operators and machines should be maintained to avoid mechanical fault.
iv.    Overdrawn Beams: Beams are supposed to be equal. But cases of overdrawn beams are rampant in some unsophisticated textile industries. This often results to waste.

Project information

Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 71 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW