Powered by eProject Guide AUTOMATED PROJECT TRACKING INFORMATION SYSTEM FOR IMO STATE GOVERNMENNT | eProject Guide

AUTOMATED PROJECT TRACKING INFORMATION SYSTEM FOR IMO STATE GOVERNMENNT

Code: A07C710C7D0421  Price: 4,000   60 Pages     Chapter 1-5    6390 Views

AUTOMATED PROJECT TRACKING INFORMATION SYSTEM FOR IMO STATE GOVERNMENT

 

ABSTRACT

We all are aware of errors and losses of funds and man-power arising from non-continuity of project ranging from one administration to another. This primarily comes or results from the deficiency associated with manual storage and processing of project information in project tracking information in the state, therefore this computer base project tracking information system of government projects all over the state from development stage to completion stage keeps awarded projects and information secured as it ensures adequate information security, time saving, easy storage and retrieval mechanism.

This project work leads to the development of software which when installed would adequately keep the government fully informed on projects and as well reduces the level of project abandonment and therefore ensure continuity in government in the area of project monitoring.

TABLE OF CONTENT

Title page…………………………………………………………………………………i

Certification…………………………………………………………………………….ii

Dedication………………………………………………………………………………iii

Acknowledgment………………….……………………………………………….iv

Abstract…………………………………………………………………………………v

 

CHAPTER ONE

  • Background of the study……………………………………………1-2
  • Statement of problem………………………………………………2-3
  • Objective of study……………………………………………………..3-4
  • Scope of study ……………………………………………………………..4
  • Significance of study ……………………………………………………4
  • Limitation …………………………………………………………………5-6
  • Definition of terms……………………………………………………6-9

CHAPTER TWO

2.1 Computer application in project tracking information

System………………………………………………………………………..10

2.2 Computer database in project tracking information

System………………………………………………………………………..11

2.3   Manual filling office document………………………………12-13

2.4 Electronic project tracking filling……………………………13-18

 

CHAPTER THREE

3.0   Methodology and analysis of the present system…….19

3.1 Methodology…………………………………………………………20-22

3.2   Description of the new system …………………………………22

3.3   Problem and weakness of the present system……23-24

3.4   Data flow diagram of the present system…………………25

3.5   Proposed high level model of new system…………………26

3.6   Organigram of Imo State Government ……………………..27

3.6.1 Data flow diagram of the present

system…………………28

 

CHAPTER FOUR

  • Analysis and design…………………………………………………….29
    • Objective of the new system ………………………………29-30
    • Data base specification project…………………………..30-31

4.2.2 Company monitoring database (MBB)………………31-32

4.3   Input and output design ……………………………………………32

4.3.4 Input and out design…………………………………………………33

4.3.5 Edith project……………………………………………………..34-37

4.4.1 Program Run time procedure……………………………………38

4.4.2 Proposed high level model main menu of the system 39

4.5.1 Program module specification………………………………………39

4.6.1 Program module flow chart and new project………………40

4.6.2 Edith existing project……………………………………………………41

4.6.3 Delete existing project ………………………………………………42

4.6.4 Dataflow diagram of the new system…………………43-46

 

CHAPTER FIVE 

  • Implementation and documentation…………………………46
    • Program implementation………………………………………46-47
    • Hardware requirement ………………………………………………47
    • Software requirement …………………………………………………47
    • Material requirement……………………………………………..47-48
    • System test run ……………………………………………………………48
    • Change over procedure…………………………………………………48
    • System maintenance ……………………………………………………49
    • Installing the program……………………………………………49-50
    • Running the program …………………………………………………50
      • Existing the program…………………………………………………….50

 

CHAPTER SIX

  • Summary……………………………………………………………………….51
    • Conclusion…………………………………………………………………51-52
    • Recommendation……………………………………………………………52

Reference…………………………………………………………………53-54

 

CHAPTER ONE

BACKGROUND OF THE STUDY

The manual ways of sourcing, processing, storing and general handling of information by Imo State Government is a kind of cumbersome time consuming and at peak delayance during project tracking, file finding when needed in the office, considering high level of bureaucracy adopted by governments in this part of the world with Imo State as a reference point. As this ugly development proceeds, during record keeping and other valuable files and information, therefore this usage of computers tracking projects and information was formed as it becomes imperative for improved information storage and tracking, stores large amounts of information, reduces so much paper work in various offices, institutions, organizations and ministries under Imo State Government. It also enables smooth distributions and enlarges information via transferring of files through computer networks. This would go along way assisting Imo State Government to take vital decision makings when it is due for it.  Furthermore, the introduction of computers will go a way in alleviating the problems associates with storage of documents used. And quick retrieval of information about the project document and how it was awarded, the nature of the projects, it’s duration, amount of money involved and finally it’s mode or method of payment.

 

AUTOMATED PROJECT TRACKING INFORMATION SYSTEM FOR IMO STATE GOVERNMENT


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 60 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW