CONSTRUCTION OF VERTICAL FIRE TUBE BOILER

Code: 7407369337852022  Price: 4,000   65 Pages     Chapter 1-5    104 Views

GET THE COMPLETE PROJECT

CONSTRUCTION OF VERTICAL FIRE TUBE BOILER

 

ABSTRACT

The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu. The boiler contains 2 steam  tubes at triangular pitch which are enclosed in a shell.  Water is introduced through the shell.  When the burner is put on, the products of combustion – excess oxygen, nitrogen and carbondioxide pass through the tubes at a high temperature and then heats the surrounding water, as a result, steam is generated. It has a capacity of 20,000cm3 of water and can produce 0.05kg of steam per hour.  It can be used widely for the generation of stem for laboratory uses and by small scale industries. The materials used were mainly mild steel.  About 10 electrodes were used for the welding and care was taken to ensure strong welding, although it is a low pressure boiler. The top sheet plato is 0.0125cm thick.  The tube bundles are galvanized tubes.  Details of the engineering and working drawings are shown.  The construction of this boiler did not follow any code.

 

CHAPTER ONE

INTRODUCTION

The term “boiler” applies to a device for generating:

a.  Steam for power, processing or heating purposes

b.  Hot water for heating purposes or hot water supply.

Boilers are designed to transmit heat from an external combustion source (usually full combustion) to a fluid contained within the boiler itself. Boilers can be broadly grouped into lower pressure type and high pressure boiler.  The constructed vertical fire tube boiler is a low pressure boiler. The boiler is constructed so as to generate steam for chemical engineering processes, heating drying, sterilizing, etc. Holes at triangular pitch were drilled at the bottom and top sheet plates of the boiler.  Steam tubes were passed through these holes and then welded strongly.  Other holes were drilled only on the top plate, so that steam will pass through them.  This was pushed in to a shell and welded together.  A mild steel plate was used to prevent the products of combustion passing from the steam tubes to come into contact with the generated steam. A stack was provided for the flue gases to escape.

GET THE COMPLETE PROJECT

Project information

Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 65 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW