ABSTRACT

With the trend of technology growth in the world of today, virtually every facet of human work has been affected; even the remotest design and implementation of a bill of materials processingof it all, and the production circle cannot be left out.  This study was carried out to verify all the manual processes involved in bill-of-material processing system and to seek a way of automating the system for effective operations.Since there is continuous moves towards technological advances that enhanced productivity of labour and free human beings of tasks done more economically by machines.  Computer and its applications have become indispensable and vital tools in economic, industrial and social development of the advanced countries of the world.  Nigeria as a developing country cannot afford to lag too far behind in this kind of revolution.  Therefore there is every need to know in every discipline the areas, which attracts computerization and why they need it.In this project, the software engineering principles were applied in the analysis, coding and testing of the software developed for the Bill-of-material processing.  Serious attention was also give to the design of the user interface.In the development of the software, visual basic programming language was used de to its support for all the features desired.  A brief user’s guide is also provided.  The end result is a software that is very effective and efficient in meeting it objectives and at the same time user friendly.

 

TABLE OF CONTENTS

Title page

Abstract

CHAPTER ONE

INTRODUCTION

1.1     Background of the study

1.2     State of the problem

1.3     Purpose of the study

1.4     Aims and objectives

1.5     Scope of study

1.6     Limitations of study

1.7     Assumptions

1.8     Definition of terms

CHAPTER TWO

LITERATURE REVIEW

CHAPTER THREE

3.1            Description and analysis of existing system

3.2            Fact finding method used

3.3            Organization structure

3.4            Objectives of Existing system

3.5            Input, Process and Output Analysis

3.6            Information Flow Diagrams

3.7            Problems of the Existing System

3.8            Justification of the New System
CHAPTER FOUR

4.1            Design of the New System

4.2            Input Specification and design

4.3            Output specification and design

4.4            File Design

4.5            Procedure chart

4.6            System flow chart

4.7            System requirements
CHAPTER FIVE

5.1            Implementation

5.2            Program Design

5.3            Program Flowchart

5.4            Pseudo code

5.5            Source Program: Test Run

CHAPTER SIX  

Documentation

CHAPTER SEVEN

7.1            Recommendation

7.2            Conclusion

Bibliography

 

CHAPTER ONE

INTRODUCTION

1.1  BACKGROUND OF THE STUDY

The use of traditional approach in problems solving has really left some loopholes in life and this has encourage the introduction of computers in various fields of work including production in terms of keeping of bill of materials in production and most recently reordering of sales.The Bill-of-material processing system has been in existence in many organizations though in a traditional approach.  Introducing the computer system will greatly improve materials requirement planning in the following aspects.(a)  Reliability(b)  Validity(c)   Accuracy(d)  Appropriate storage of data(e)   TimelinessThe above factors are due to the fact that the computer possesses some great features, and advantages over traditional approach.

1.2  STATEMENT OF THE PROBLEMS

No doubt that the use of traditional system has created a lot of problems in production of roofing sheets at EMENITE.  The quantity and amount of materials and sub-assembly needed to produce a product cannot be traceable because of glaring disadvantages stated below.Ø Poor information storage method: The use of office files and file cabinets is not a good form of information storage.Ø Insecurity of data because it is prone to vandalization and unauthroised accessibilityØ Duplication of data in various departments because of the nature of work neededIt takes a long time in accessing records in the manual system (filing system) due to the nature of the job.  It is not always good for materials to finish unnoticed, so the re-ordering of materials are not made as and when due.The introduction of the computer system will help eliminate these problems to an extent.

1.3  PURPOSE OF THE STUDY

This project is generally towards eradication of all the deformities and curb hookups of the manual method of bill-of-materials processing, thus developing a new system to handle the jobs involved in the processing of Bill-of-material electronically.

1.4   AIMS AND OBJECTIVES

In an organization whether manufacturing or not manufacturing where the competitors and the objectives of the organization are at the top of the scale of preference especially the meeting of the standard in the market, there is always a focus on the organizational goal which might not be the goals of the sub-system to avoid sub-optimality, working towards a divisional or individual benefits.The aims of this work include the following;

(1) To work towards the elimination of ineffective modes of operation; it centers on the user having a good atmosphere for work thereby minimizing stress.

(2) The objective from the initiator of the proposal is generally towards combating al the aims and the problems being discovered on the existing system, which are listed under problem of study.

(3)  Safeguarding of information through effective monitoring of access is the filing system (database).(4) Knowing when materials are almost out of stock, in order to make an order so as not to show the production pace of the labourers.

1.5    SCOPE OF STUDY

The scope of this project work covers all the areas of bill-of-materials processing systems, which include the cost of individual material responsible for production, the stock control or inventory areas, and every other necessary areas.  The storage of records, which have different fields that could be expanded a little to form files.  These file five rooms for editing, updating and retrieval of information when needed.  Some of these fields are item description, quality, total requirement, re-ordering point, labour cost, overhead cost, profit, lower cost, etc.This project is focused on the entire information recorded on Bill-of-material processing.

DESIGN AND IMPLEMENTATION OF A BILL OF MATERIALS PROCESSING SYSTEM (A CASE STUDY OF EMENITE NIG. LTD. EMENE, ENUGU)


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW