URBANIZATION AND INDUSTRIALIZATION IN NIGERIA

Code: 85CBDFC8980521  Price: 4,000   61 Pages     Chapter 1-5    6371 Views

URBANIZATION AND INDUSTRIALIZATION IN NIGERIA

 

ABSTRACT

The focus of this study is on how the manufacturing industries in Kaduna metropolis have impacted on the development of the area during the period 1957-2007. And, the main areas it has impacted the city include: migration, urban economy, urban development, spatial patterns, class-formation, effects of Kaduna’s growth on its immediate hinterland. Thus, we attempt to answer the question: In what ways did the manufacturing industry contribute to the development of the Kaduna metropolis?

This is significant because of the shift in economic importance from agriculture to manufacturing that has led to the transformation of Kaduna metropolis especially in spatial terms; values, attitudes and population increase of the residents. For example, within a decade Kaduna almost had a fourfold growth from 39,000 in 1952 to 149,000 in 1963. The demand for a workforce in the industries and the consequent boom in the commercial and service sectors account for this rapid growth in the area. Equally important, is the emergence and rapid growth of satellite villages around the urban core of Kaduna. Of these villages, Makera and Kakuri, were transformed from rural communities into cosmopolitan sub-urban areas due to the concentration of the textile factories in the area. Therefore, Kaduna during this period grew from a military garrison and administrative town into an industrial city, which was commonly known as the ‘Manchester of Nigeria’.

CHAPTER ONE

GENERAL BACKGROUND OF THE STUDY

The aim of this chapter is to introduce the study, Urbanization and Industrialization in Nigeria: A Case Study of Kaduna Metropolis, 1957-2007.To achieve this objective the chapter will be organized as follows: Introduction; the aims and objectives of the study; the statement of the Research problem; Scope of the study; Justification of the study; Literature Review; Theoretical Framework; Methodology of the Study; Limitation of the study; and Notes on Source.

1.0INTRODUCTION

Industrialization can be defined as the extensive introduction of the latest scientific and technological achievements in production in the comprehensive technical re-equipment of the natural economy5. Specifically, in Kaduna this process of introducing scientific and technological achievements in production led to the establishment of a factory equipped with 14,000 spindles and 300 automatic looms, costing the Northern Regional Government £1,250,000 in 1957. Thus, the Kaduna Textiles Limited (KTL) was established6. This was the first large scale manufacturing industry in Kaduna. Subsequently, other large scale establishment that employed many people in the mass production of industrial or consumer goods were also established. These factories include Paper products, printing and publishing, brewery, car assembly plant, Asbestos-Cements Products, Fertilizers and Petroleum Refinery Plant.

 

DOWNLOAD  COMPLETE PROJECT MATERIAL

URBANIZATION AND INDUSTRIALIZATION IN NIGERIA


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW