Powered by eProject Guide NEW FORMULAE FOR ESTIMATING FIXED INVESTMENT CAPITAL COSTS | eProject Guide

NEW FORMULAE FOR ESTIMATING FIXED INVESTMENT CAPITAL COSTS

Code: 5DB2EC69BD0521  Price: 4,000   61 Pages     Chapter 1-5    6402 Views

NEW FORMULAE FOR ESTIMATING FIXED INVESTMENT CAPITAL COSTS

 

ABSTRACT

Fixed capital investment cost is very important for the start up of any chemical plant, because it determine the evaluation of any project in a company. Before commencement of any chemical plant, there are certain amount needed for the operation such amount is called the working capital. Which is the capital needed for the plant to operate to the point when income is earned. It includes the cost of raw materials and intermediates in the process start up cost, finished methods inventories, and funds to cover outstanding accounts from customers. Fixed capital is of two types namely; the manufacturing fixed capital investment and non – manufacturing fixed investment. The methods use for estimating or calculating fixed capital investment cost in chemical plant or process industries includes the followings;

  1. land factors
  2. detailed –items estimate
  3. percentage of delivered – equipment cost
  4. unit – cost estimate
  5. power factor applied to plant capacity ratio
  6. investment cost per unit of capacity
  7. turnover ratios

For any chemical plant operation, fixed capital investment cost is necessary, to determine the evaluation of any project.

 

TABLE OF CONTENT

CHAPTER ONE

  1. Introduction                                                                1

1.1       Manufacturing fixed capital investment         2

1.2       Non-Manufacturing fixed capital investment 3

1.3       Method use for calculating fixed

capital investment                                                       4

1.4       Types of compartmentalization                                   6

CHAPTER TWO

  1. Literature review                                                         7
  2. Estimating cash flow                                                  9
  3. Project evaluation                                                       11
  4. Project design                                                                         11
  5. Payback period                                                                       12
  6. Public cost indices                                                      13
  7. Industrial approach                                                     14
  8. Accounting rate of return (arrangement)        14
  9. Discounted cash flow

(net present value) method                                         15

  1. Acceptance criterion                                                   17
  2. Time value of money                                                  17
  3. Power factor applied to plant capacity ratio   18
  4. Investment cost per unit of capacity               19
  5. Turnover ratios                                                                        19
  6. New method for estimating fixed cost                       19

 

CHAPTER THREE

3.0       Estimating fixed cost investment                               21

3.1       Method for estimating fixed cost investment 21

3.2       Detailed – item estimate                                             22

3.3       Unit-cot estimate                                                        22

3.4       Percentage of delivered equipment cost         23

3.5       Lang factors for approximation of

capital investment                                                      24

3.6       Factors considered in estimating cost                         24

3.7       Prevailing cost                                                                         25

3.8       Inflation                                                                                  26

3.9       Foreign exchange rates                                               28

 

NEW FORMULAE FOR ESTIMATING FIXED INVESTMENT CAPITAL COSTS


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW