WATER SUPPLY PLANNING

Code: 51A5A382B00521  Price: 4,000   61 Pages     Chapter 1-5    6481 Views

ABSTRACT

Water is one of the most important natural resources for all life on earth. The availability and quality of water always have played an important part in determining not only where people can live, but also their quality of life. Even though there always has been plenty of fresh water on earth, water has not always been available when and where it is needed, nor is it always of suitable quality for all uses. Water must be considered as a finite resource that has limits and boundaries to its availability and suitability for use.Inadequate water supply in  Arawa  area  of  Gombe  has  been  associated  with  lack  of accessibility  and   population increase . As population of the area increases with time, competition for water demand also increases which outweighs the supply of water in the area thereby rendering water supply inadequate.Also reasons such as the inability to extract water from  sources  due to non-distribution of  public  water  supply  systems  and  lack of  maintenance  of  water facilities in the study area  have  contributed  to  the  insufficiency  of  water  supply.The  survey  was  carried  out  as  a  result  of  the  inadequacies  in  the  provision  of  public  water  supply  in  Arawa  community. So far, the  research  was  able  to  dictate  the  nature  and  problems  of  water  supply  in  the  study  area. The  field  survey  and  analysis  shows  that  the  problem  of  water  supply  in   the  area  ranges  from  the  absence  of  public  pipe  borne  water  which  have  been  related  to  the  neglect  of  the  area  by  the  state  water  corporation  board, poor  maintenance  of  facilities  due  to  lack  of  funds  as  well  as  the  rapid  population  growth  of  the  area.

WATER SUPPLY PLANNING

Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW