Powered by eProject Guide APPLICATION OF INTELLIGENT WELL COMPLETION IN OPTIMIZING PRODUCTION FROM OIL RIM RESERVOIRS | eProject Guide

APPLICATION OF INTELLIGENT WELL COMPLETION IN OPTIMIZING PRODUCTION FROM OIL RIM RESERVOIRS

Code: 93669E63D40521  Price: 4,000   61 Pages     Chapter 1-5    6434 Views

ABSTRACT          

An oil rim reservoir is a saturated reservoir with an oil column of limited thickness, less than 90 feet, overlain by a gas cap and underlain by an aquifer. Among the various challenges encountered in producing oil rim reservoirs, water and/or gas coning and breakthrough is the most prominent. Water and gas breakthrough occurs majorly due to heel-toe effect and reservoir permeability variations. Inflow control devices (ICDs) were deployed to mitigate the heel-toe effect thereby delaying the water and gas breakthrough.   The reservoir is a typical onshore Niger Delta oil rim reservoir of 30 feet oil column thickness. A long horizontal well of 4250 feet was completed in the oil column. ECLIPSE 100 reservoir simulator was used in modeling the reservoir. To assess the performance of ICDs, two case scenarios were simulated: conventional horizontal well without ICD completion and horizontal well with ICD completion. Modeling of ICDs in ECLIPSE was achieved by the Multi-segment Well model. A multi-segment well model is an advanced well modeling that allows accurate modeling of multi-phase flow and pressure variations in wells with a reservoir simulation model. The well was divided into 25 segments.   This project highlights the benefit of ICDs in mitigating the heel-toe problem faced in oil rim reservoir development. Results obtained from the simulation showed that for the case without ICDs, PLT plot indicated that only about 15% of the well length was contributing to flow. The heel-toe effect resulted in early water and gas coning, and a low oil recovery of 21%. Deployment of ICDs yielded a more uniform fluid inflow (100%) along the entire length of the well; delayed water and gas breakthrough for about one year; increased well productive life by one year; and increased oil recovery by an extra 22% (3.65 MMSTB)

APPLICATION OF INTELLIGENT WELL COMPLETION IN OPTIMIZING PRODUCTION FROM OIL RIM RESERVOIRS

Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW