Powered by eProject Guide EVALUATION OF PRODUCTION PROCESS AND CAPACITY UTILIZATION (A CASE STUDY OF NIGERIA BREWERIES, ENUGU) | eProject Guide

EVALUATION OF PRODUCTION PROCESS AND CAPACITY UTILIZATION (A CASE STUDY OF NIGERIA BREWERIES, ENUGU)

Code: 017D8EE0880521  Price: 4,000   61 Pages     Chapter 1-5    6314 Views

EVALUATION OF PRODUCTION PROCESS AND CAPACITY UTILIZATION (A CASE STUDY OF NIGERIA BREWERIES, ENUGU)

ABSTRACT

This research work aims at critically evaluating the process of production and the extent to which the installed capacity of Nigeria Breweries utilized.  The study traced the historical development of the company, its range of production and the extent which its capacity is utilized.

In collecting data for the research, two sources of data collection were used.  They are primary and secondary data sources.  The primary data were gotten through personal interview and observation, while secondary data were collected from Nigeria Breweries Plc Enugu and other relevant materials and information centres.

From the analysis of the data collected, the following findings were made.

1.           There is problem with the acquisition of the spare pars because of the prohibitive price of foreign exchange.

2.           Poor Maintenance of frequent machine breakdown, statistics are not kept on the performance of machine.

3.           Inadequate raw material which is one of the factors of the full utilization of the installed capacity.

4.           Power failure breakdown on the installed capacity, their installation of 15mega watts electric generating plants as a safeguard against intermittent power supply from Power Holding Company of Nigeria (PHCN) the company still suffers from Power Supply problem.

Based on the above findings the following recommendation were offered after analyzing.

1.           The rate of breakdown of machines will prevent the purchase of out model, recommendation of periodic maintenance of machine should be adopted to reduce incidence of breakdown.

2.           There is high cost of certain items like bear which makes the consumptions low. It was recommended that the company should be doing a objective pricing of its goods that it does not price itself out of the market.

3.           There is not enough training and development of staffs for proper handling of the facilities of production industries it was recommended that enough training and development of staff should be provided by the company. It will enable them to shift emphasis on keeping track of manufacturing line cost of facilities of production.

CHAPTER ONE

1.0       INTRODUCTION

1.1    BACKGROUND OF THE STUDY

Production management refers to those activities that involve planning, organizing, directing, integration, controlling, and evaluation of the entire process of manufacturing goods or providing services at the right cost and in its right time, quantity, quality and place.  Production management is about in the way organization produces goods and services. For instance, everything you eat sit on, read and knock about on the sport field comes to you, courtesy of the production managers who organized its production.  Every book you borrow from the library, every treatment you receive at the hospital, every service you expect in the shops and every lecture you attend at school, all have been produced. Production is all evolving.  Which the people who supervised their production may not always be called production manager, but that is what they really are (production manager but that is what they really are) production management is concerned with the organization of the use of equipment and their resources.  Production management is utilization of the highest production resource at the least cost.

 

EVALUATION OF PRODUCTION PROCESS AND CAPACITY UTILIZATION (A CASE STUDY OF NIGERIA BREWERIES, ENUGU)


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW