AN EVALUATION OF PRODUCTION PROCESS AND CAPACITY UTILISATION. (A CASE STUDY OF NIGERIAN BREWERIES ENUGU)

Code: B342EEC9740521  Price: 4,000   61 Pages     Chapter 1-5    6295 Views

AN EVALUATION OF PRODUCTION PROCESS AND CAPACITY UTILIZATION. (A CASE STUDY OF NIGERIAN BREWERIES ENUGU)

 

ABSTRACT

This research work aims at critically evaluating the process of production and the extent to which the installed capacity of Nigerian breweries is utilized. The study traced the historical development of the company its range of product and the extent which its capacity is utilized.

In collecting data for the research, two sources of data collection were used. They are primary and secondary data sources. The primary data were got through personal outer view and observations. While secondary data were collected from Nigerian breweries Plc Enugu and other relevant materials and information centers.

From the analysis of the data collected, the following findings were made:

1.         There is problem with the acquisition of spare parts because of the `            prohibitive price of foreign exchange.

2.         Poor maintenance of frequent machine breakdown. Statistics are not kept on the performance of machine.

3.         Inadequate of raw materials which is one of the factors to the full utilization of the installed capacity.

4.         Power failure breakdown on the production process. Despite the installation of 15 – mega watts electric generating plant as a safeguard against intermittent power supply from national electric power authority (NEPA) the company still suffer from power supply problem.

Based on the above findings, the following recommendations were offered after analyzing.

1.         The rate of breakdown of machineries will prevent the [purchase of out model. Recommendation of periodic maintenance of machine should be adopted to reduce incidence of breakdown.

2.         There is high cost of certain items, like beer which makes the consumption low. It was recommended that the company should be dong an objective pricing if its goods so that it does not price itself out of the market.

3.         There is not enough training and development of staffs for the proper handing of the facilities of production industries it was recommended that enough training and development of staff should be provided the company. It will enable them to shift emphasis on keeping track of manufacturing line cost to facilities of production.

CHAPTER ONE

1.0              INTRODUCTION

1.1       BACKGROUND OF THE STUDY

Production management refers to those activities involving planning, organizing, directing, integrating, controlling and evaluating the entire process of manufacturing goods or providing services at the right cost and in its right time, quantity, quality the place. Production management is about the way organizations produces goods and services. For instance, everything you wear, eat, sit on, use, read of knock about on the sports field comes to you courtesy of the production managers who organized its production.

 

AN EVALUATION OF PRODUCTION PROCESS AND CAPACITY UTILIZATION. (A CASE STUDY OF NIGERIAN BREWERIES ENUGU)


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.

Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.

Material Information
  • ₦4,000.00 1 Price:
  • 61 2 No. of Pages:
  • 5 3 No. of Chapters:
  • No 4 Has Implementation:
FOR ENQUIRIES WE ARE AVAILABLE 24/7

Contact us on

DEPARTMENT
LAW