CHAPTER ONE
CHAPTER TWO
2.0 Preamble
2.1 Causes of Building Failure in Nigeria
2.1.1 Poor Workmanship
2.1.2 Engagement of quack professional / cowboys
2.1.3 Poor Soil Investigation
2.1.4 High Cost of Building Materials
2.1.5 Lack of Proper Monitoring & Supervision
2.1.6 Bad design
2.1.7 Bad Foundation
2.1.8 Extra ordinary Load
2.1.9 Unexpected failure mode
2.1.10 Cases of Building Failure with their causes
2.2 Building Code / Registration
2.3 Challenges to professional Builders in Averting Building Failure
2.3.1 Studying Production Information
2.3.2 Construction Planning
2.3.3 Managing Construction Process
CHAPTER THREE
3.0 Research Methodology
3.1 Introduction
3.2 Nature of Data
3.3 Research Design
3.4 Population Study
3.5 Sample Technique
3.6 Method of Data Analysis
CHAPTER FOUR
4.4 Inspection of Collapsed Building
CHAPTER FIVE
5.0 Summary Conclusion and Recommendation
5.1 Introduction
5.2 Summary Finding
5.3 Conclusion
5.4 Recommendation
REFERENCES
CHAPTER ONE
Buildings are structure, which serve as shelter for man, properties and activities. They must be properly planned, designed and created to obtain desired satisfaction from the environment. The factors to be observed in building construction include durability, adequate stability to prevent its failure of discomfort to the users, resistance to weather, fire outbreak and other forms of accidents.
The styles of building construction are constantly changing with introduction of new materials and techniques of construction consequently; the work involved in the design and construction stages of buildings are largely that will meet the expected building standards and aesthetic economy basis.
Several codes of practice universally accepted are available for the design and construction of building and these codes, through foreign, should be followed as a guide to building construction by the building team. A high level of skill is needed in designing and constructing buildings, competence and construction and craftsmanship from buildings, competence and craftsmanship from the team, which include the architect, the Engineers or contractor (Structural, Mechanical and Electrical) and the Local Authority.
However, failure is an unacceptable difference between expected and observed performance. A failure can be considered as occurring in a component when that component can no longer be relied upon to fulfill its principal functions. Limited deflection in a floor which cause a certain level of cracking distortion in partition could be reasonably be considered as defect but not a failure, where as excessive defection resulting in serious damage to partition, ceilings and floor is a failure (RODD is 1993). Those who investigate and report on failures of engineers facilities are in good position to identify trends lending to identify trends leading to structural safety problem and to suggest topics for critical research to militate against this trend (CHAPMAN, 2000).
Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as a guide in developing your original research work. Thanks.
Disclaimer: All undertaking works, records, and reports posted on this website, eprojectguide.com are the property/copyright of their individual proprietors. They are for research reference/direction purposes and the works are publicly supported. Do not present another person’s work as your own to maintain a strategic distance from counterfeiting its results. Use it as a guide and not duplicate the work in exactly the same words (verbatim). eprojectguide.com is a vault of exploration works simply like academia.edu, researchgate.net, scribd.com, docsity.com, course hero, and numerous different stages where clients transfer works. The paid membership on eprojectguide.com is a method by which the site is kept up to help Open Education. In the event that you see your work posted here, and you need it to be eliminated/credited, it would be ideal if you call us on +2348064699975 or send us a mail along with the web address linked to the work, to eprojectguide@gmail.com. We will answer to and honor each solicitation. Kindly note notification it might take up to 24 – 48 hours to handle your solicitation.